LB 100-240 Electric Steam Generators

LB-100 (L) 100 Kilowatt (kW) Electrical Power Rating Low Pressure Electric Steam Generator

LB-100 (L), 100 Kilowatt (kW) Electrical Power Rating Low Pressure Electric Steam Generator

Dimensions

Length51 in
Width
(No Options)
30 in
Width
(with MAFD option)
34 in
Height37 in

Minimum Clearance

Total Height45 in
Total Length120 in
Total Width60 in

Industry Standards

  • American Society of Mechanical Engineers (ASME) - Boiler and Pressure Vessel Code
  • American Society of Mechanical Engineers (ASME) - CSD-1
  • Canadian Underwriters Laboratories (cUL)
  • Underwriters Laboratories (UL)
ASME UL Listed

Standard Features

ASME Certified High Pressure Safety Reset
UL Listed and labeled under UL 834 Dual Pressure Controls (UL 353)
Low Level Cut-Off (LLCO) (UL 353) Safety Relief Valve possessing the ASME V Mark

Recommended Options (Non-Standard)

Spare Parts Package Motorized Automatic Flush and Drain (MAFD)
Single Service Transformer 5-Micron Water Filter

Specifications

BrandElectro-Steam™
VariantLow Pressure
Electrical Power100 kW
Power Supply Voltage1208 VAC, 230 VAC, 380 VAC, 415 VAC, 440 VAC, 480 VAC, 600 VAC
Phase3
Frequency50 Hz, 60 Hz
Boiler Horse Power10.0 bhp
Steam Capacity2345.0 lb/hr (156.49 kg/hr)
Water Consumption41.34 gal/hr (156.49 L/hr)
Gross British Thermal Units (BTU) Output334,754 Btu/hr
Maximum Boiler Pressure15 psi
Operating Pressure0 to 11 psi
Maximum Boiler Capacity26.5 gal
Note for Operating PressureFactory Set at 80 psi
Boiler Fill Capacity22 gal
Boiler Material3Carbon Steel
Cabinet Material304 Stainless Steel
Plumbing MaterialBrass (Schedule 40), Carbon Steel (Schedule 40)

Amperage by Voltage (3Ø Phase)

208 VAC240 VAC380 VAC415 VAC440 VAC480 VAC600 VAC
277.6 A
(138.8 A per Box)
261.9 A
(131 A per Box)
151.9 A
(76 A per Box)
139.1 A
(69.6 A per Box)
131.2 A
(65.6 A per Box)
120.3 A
(60.1 A per Box)
96.2 A
(48.1 A per Box)

Plumbing Connection Sizes

Water Inlet 1/2" NPT (National Pipe Thread) (Female) - Y-Strainer, Brass
Steam Outlet 1" NPT (National Pipe Thread) Union - Ball Valve, Brass
Safety Valve 2" NPT (National Pipe Thread) (Female) - Safety Valve, Brass
Drain 1" National Pipe Thread (NPT) (Female) - Ball Valve, Brass
Additional Drain (Motorized Automatic Flush and Drain (MAFD) Option Included) 1" NPT (National Pipe Thread) (Female) - Motorized Valve, Brass

Options

Spare Parts Package Includes 18-Month Warranty (12-Month Standard)
(2) Electric Heaters and (2) Heater Gaskets
(2) Sight Glass Tubes and (4) Washers
(1) Pressure Control
(1) Contactor
Motorized Automatic Flush and Drain (MAFD) During Start-Up before steam pressure is accumulated, the Motorized Automatic Flush and Drain option cycles fresh water through the boiler for 0-300 seconds (Factory set for 180 seconds or three (3) minutes). As old water is drained out, fresh water will be cycled in. This drain valve will not open if boiler pressure exceeds 5 psi, and the electric heaters are locked out during flush cycle.
Single Service Transformer Supplied standard with all portable steam generators, the Single Service Transformer steps down the primary high voltage to provide 120 VAC Single Phase (1Ø) to the controls; with this option, only the one (1) primary high voltage supply is required.
5-Micron Water Filter 2-stage, 5-micron water filter installed into incoming water line to reduce sediment, dirt, rust, chlorine, and even odor from incoming water supply.
Manual Low Water Reset4 Manual Low Water Reset trips if the electric heaters shut-off because of a low water condition. Reset must be manually pressed to resume steam production.
Portable Mounting Includes Wheels
Push Handle
Single Service Transformer Option
Water Feed Booster Pump The minimum requirement for your water pressure is the operating pressure +25 psi; if your water pressure is below this requirement, this option must be added. The Water Feed Booster Pump increases your incoming water pressure to overcome the operating pressure of the steam generator. The Pump requires a 5-150 psi water supply with a minimum flow rate of 2 gpm.
  • 1 Electro-Steam™ 100-240 kW electric steam generators require three (3) power supplies: Two (2) primary high voltage supplies and one (1) secondary 120 VAC 1Ø, 50/60 Hz supply. Each generator is custom built to accommodate two (2) supplies of only one (1) customer specific high voltage for the heaters. 120 VAC 1Ø, 50/60 Hz must also be supplied for the controls, unless the Single Service Transformer option is added.
  • 2 Calculations are based off of a 212°F boiler feed-water temperature. Boiler feed-water temperatures that range between 60°F and 140°F, are approximately 80% to 90% of the calculated values shown. Boiler feed-water must not exceed 140°F.
  • 3 Wetted Surfaces.
  • 4 A Manual Low Water Reset Button is supplied standard with every steam generator, but it is disabled. If this Reset Button is required as per your local boiler codes, simply plug the two attached wires into the PC-Board terminals labeled "Reset".