Standard Features
| ASME Certified | High Pressure Safety Reset |
| UL Listed and labeled under UL 834 | Dual Pressure Controls (UL 353) |
| Low Level Cut-Off (LLCO) (UL 353) | Safety Relief Valve possessing the ASME V Mark |
| Single Service Transformer |
Recommended Options (Non-Standard)
| Motorized Automatic Flush and Drain (MAFD) | Spare Parts Package |
| 5-Micron Water Filter |
Specifications
| Brand | Electro-Steam™ |
|---|---|
| Electrical Power | 240 kW (60 kW per Box) (4 Boxes) |
| Alternating Current (AC) Voltage1 | 208 V, 230 V, 360 V, 400 V, 480 V, 600 V |
| Phase | 3 |
| Frequency | 50 Hz, 60 Hz |
| Boiler Horse Power | 24.0 bhp (12 bhp per Boiler) |
| Steam Capacity2 | 828.0 lb/hr (375.57 kg/hr) |
| Average Water Consumption3 | 99.22 gal/hr (375.59 L/hr) |
| Gross British Thermal Units (BTU) Output4 | 803,328 Btu/hr |
| Maximum Boiler Pressure | 100 psi |
| Operating Pressure | 0 to 80 psi |
| Note for Operating Pressure | Factory Set at 80 psi |
| Maximum Boiler Capacity | 53 gal (26.5 Gallons per Boiler) |
| Boiler Fill Capacity | 44 gal (22.0 Gallons per Boiler) |
| Boiler Material5 | Carbon Steel |
| Cabinet Material | 304 Stainless Steel |
| Plumbing Material6 | Brass (Schedule 40), Carbon Steel (Schedule 40) |
Amperage by Voltage (3Ø Phase)
| 208 VAC | 230 VAC | 360 VAC | 400 VAC | 480 VAC | 600 VAC |
|---|---|---|---|---|---|
| 666.2 Amps (166.5 Amps per Box) (4 Boxes) |
628.6 Amps (157.2 Amps per Box) (4 Boxes) |
405.7 Amps (101.4 Amps per Box) (4 Boxes) |
362.3 Amps (90.59 Amps per Box) (4 Boxes) |
288.7 Amps (72.17 Amps per Box) (4 Boxes) |
230.9 Amps (57.74 Amps per Box) (4 Boxes) |
Plumbing Connection Sizes
| Water Inlet (Shared) | 1/2" NPT (Female) - Y-Strainer, Brass |
|---|---|
| Steam Outlet (Shared) | 6" Flange (150 psi, 4-Hole) - 2-1/2" pipe connection |
| Safety Valves (x2)(Separate) | 1-1/4" NPT (Male) (x2) - Two Black Pipes routed to the floor; one from each Safety Valve. |
| Drain + MAFD Option (Shared) | 1" NPT (Female) - Elbow, Brass |
| Steam Trap (Not Included) | 3/4" NPT (Female) - Threaded connection on the bottom of the 2-1/2" shared Steam Outlet pipe. |
Included Options
| Single Service Transformer7 | Two of these options are supplied standard in all double stack steam generators; the Transformer steps down the primary high voltage supplied for the heaters, in order to provide 120VAC 1Ø for the controls; with this option, only the two (2) primary high voltage supplies are required. |
|---|---|
| Manual Low Water Reset8 | Manual Low Water Reset trips if the electric heaters shut-off because of a low water condition. Reset must be manually pressed to resume steam production. |
| Water Feed Booster Pump | Two Water Feed Booster Pumps are supplied standard in all high-pressure double stack steam generators. Each Water Feed Booster Pump increases the incoming water pressure to overcome the operating pressure of each steam generator. Each Booster Pump requires a 5-150 psi water supply with a minimum flow rate of 3 gpm (At least 6 gpm is required for both) |
Options
| Motorized Automatic Flush and Drain (MAFD) | During Start-Up before steam pressure is accumulated, the Motorized Automatic Flush and Drain option cycles fresh water through the boiler for 0-300 seconds (Factory set for 180 seconds or three (3) minutes). As old water is drained out, fresh water will be cycled in. This drain valve will not open if boiler pressure exceeds 5 psi, and the electric heaters are locked out during flush cycle. |
|---|---|
| Spare Parts Package Includes | 18-Month Warranty (12-Month Standard) (2) Electric Heaters & (2) Heater Gaskets (2) Sight Glass Tubes & (4) Washers (1) Pressure Control (1) Contactor |
| 5-Micron Water Filter | 2-stage, 5-micron water filter installed into incoming water line to reduce sediment, dirt, rust, chlorine, and even odor from incoming water supply. |
- 1 Electro-Steam™ Double Stack electric steam generators are two (2) electric steam boilers stacked inside one (1) cabinet. They are plumbed together, but not wired together. Double Stack steam generators require two (2) or four (4) customer specific high voltage feeds, one (1) per Electrical Box - 150 kW models have two (2) Electrical Boxes to feed and 200 to 480 kW models have four (4).
- 2 Calculated values are based off of a 212ºF boiler feed-water temperature. However, it must not exceed 140ºF. Temperatures that range between 60ºF and 140ºF, are approximately 80% to 90% of the calculated values shown.
- 3 Calculated values are based off of a 212ºF boiler feed-water temperature. However, it must not exceed 140ºF. Temperatures that range between 60ºF and 140ºF, are approximately 80% to 90% of the calculated values shown.
- 4 Calculated values are based off of a 212ºF boiler feed-water temperature. However, it must not exceed 140ºF. Temperatures that range between 60ºF and 140ºF, are approximately 80% to 90% of the calculated values shown.
- 5 Wetted Surfaces.
- 6 Wetted Surfaces.
- 7 Two (2) Single Service Transformer options are included with each double stack electric steam generator. These options provide 120 VAC 1Ø, 50/60 Hz for each boiler's controls.
- 8 A Manual Low Water Reset Button is supplied standard with every steam generator, but it is disabled. If this Reset Button is required as per your local boiler codes, simply plug the two attached wires into the PC-Board terminals labeled "Reset"